As everybody knows, the Kosciuszko Bridge and environs are getting a full-out repaving, with the work being conducted between 10 P.M. and 5 A.M. Which means there are times when there is no roadwork ahead to alert drivers to. The DOT has a high-tech way to handle that situation.
No comments:
Post a Comment